| 1 |
Who is the legal entity? Name, registration number, production site address. |
Business licence, export licence, factory address on company letterhead. |
The name on the licence, the quotation and the shipping paperwork are the same, and the address is the site that will run your part. |
| 2 |
Factory or trader? Which process steps happen on your own floor? |
Process flow for your part, equipment list, monthly capacity for that process. |
They describe mixing, curing, post-cure and finishing in order, and name the capacity available for your volume. |
| 3 |
Which food-contact standards apply? FDA, LFGB, EU — for this compound. |
Full test reports, not a certificate thumbnail. |
The report names the compound, the standard, the laboratory and the sample date — and the compound matches your grade. |
| 4 |
Does the report scope match my part? |
Report pages showing material identity, part description, colour and batch. |
The material on the report is the material on your drawing, in the colour you ordered. |
| 5 |
What hardness band can you hold? |
Target hardness with a stated tolerance band on the drawing. |
A measurable band, for example ±3 Shore A, plus a note on which dimensions they control in-house. |
| 6 |
What is the compression set? |
Compression set figure with the test temperature and duration attached. |
A number with conditions, such as ≤12% at 200 °C — not the phrase "excellent compression set". |
| 7 |
How is a batch traced? |
Lot numbering scheme, retained-sample policy, certificate of analysis per batch. |
A finished part can be traced back to a compound lot and a cure date without a manual search. |
| 8 |
What does the sample round include? |
Written sample plan: quantity, tests, acceptance criteria, lead time. |
The plan lists what will be measured, by whom, and who signs off before production starts. |
| 9 |
Who owns the tool? |
Tooling agreement stating ownership, storage and transfer conditions. |
Ownership, transfer cost and condition of the tool are written down before the first invoice. |
| 10 |
How will changes be announced? |
Documented change-notification route for compound, process or sub-supplier changes. |
A written procedure with a notice period — not a promise made in an email thread. |